Contract for cable laying and burial of 97 inter-array cables at Gode Wind 1+2.
CT Offshore received a contract from DONG Energy for the laying and burial of inter-array cables at the Gode Wind 1 and Gode Wind 2 offshore wind farm sites in the German North Sea. The work scope covered installation and burial of 97 inter-array cable connections, with offshore execution scheduled to start in summer 2015 and performed from CT Offshore’s cable-laying vessel SIA and trenching ROV equipment.