140 km of 34 kV inter-array / offshore medium-voltage cables for internal farm cabling at Gode Wind 1 and 2
Nexans (Nexans Deutschland) was contracted by DONG Energy to deliver and install medium-voltage inter-array submarine cables for the Gode Wind 1 and 2 offshore wind farms in Germany. The scope covered the supply and offshore installation of 140 km of 34 kV cables to interconnect the wind turbines and connect them to the offshore transformer platform as part of the wind farms’ internal cabling system.