Installed the first inter-array cable at Gode Wind 1 + 2; used CLV SIA and CTO 107-1100 trencher ROV
CT Offshore carried out inter-array cable installation at Dong Energy’s Gode Wind 1 and 2 offshore wind farm sites. The company installed the first inter-array cable using the cable laying vessel (CLV) SIA and deployed its CTO 107-1100 trencher ROV to support cable installation and seabed trenching/burial operations.