OWT/JBO provided structural verification and detailed substructure engineering services for the tripod support structures at the Global Tech I offshore wind farm, performing load calculations in coordination with the turbine manufacturer and verifying compliance with BSH Standard Design / Design Basis requirements. The referenced planning/design work was completed in 2011 for the 80-tripod foundation concept supporting the 80 AREVA M5000 turbines.