By 2023, Gina Krog was fully electrified by power from shore via the Johan Sverdrup field, indicating that the electrification interconnector to the platform had entered regular operational service supplying its full intended shore-based power, and subsequently enabling Gina Krog to act as a hub for onward electrification of nearby fields such as Sleipner.