approximately 140 kilometers of 66 kilovolt inter-array cables / approximately 140 kilometres of 66 kV inter-array cables
TKF Subsea Solutions B.V., as part of a consortium with Royal Boskalis B.V., signed a contract with OWP Gennaker GmbH (developed by Skyborn Renewables) to deliver the inter-array cable system for the Gennaker offshore wind farm in the German Baltic Sea. TKF was to manufacture approximately 140 km of 66 kV inter-array cables in the Netherlands for the array network connecting the wind turbines, and the consortium scope also covered engineering, testing and supply of associated cable accessories as part of the complete inter-array cable system.