Rock bag deployment and installation on/around cable protection systems to reduce cable movement and prolong array cable life at Galloper.
Rovco was awarded a contract to deploy and install offshore rock bags at precise locations on and around the wind farm’s cable protection systems (CPS) to stabilise and prolong the life of the Galloper array cables. The work used a DP2 subsea support vessel with Rovco’s survey equipment and work-class ROV to place rock bags on and around live cables in water depths of approximately 26–39 m.