JDR Cables subcontracted by VBMS to manufacture Galloper inter-array/array cables (manufactured during 2016 at Hartlepool); VBMS reported ~70 km of cable laid and buried.
JDR Cables was subcontracted by VBMS to manufacture the inter-array (array) cables for the Galloper offshore wind farm. The cables were manufactured during 2016 at JDR’s Hartlepool facilities in North East England for installation on the 56-turbine wind farm.