Positive
Project advancing - milestone achieved
Medium Impact
Significant progress or notable issue
In March 2024, the developer defined the engineering design envelope for the offshore export cable system and corridor for Five Estuaries Transmission in its Cable Statement and Outline Cable Specification and Installation Plan. The documents specify up to two 275 kV HVAC offshore export cable circuits with a total length of up to 196 km, an export cable corridor up to 2 km wide, and associated installation parameters such as maximum burial depth and seabed disturbance, and set proposed Order Limits for the Export Cable Corridor within which the final route will be designed.