Neutral
Informational - no clear directional impact
Low Impact
Minor progress or informational
Between 2002 and 2007, Finnish Sea Service conducted operational-phase inspections on the Fenno‑Skan 1 and 2 high-voltage DC interconnector between Finland and Sweden. The company inspected the earthing systems and DC transmission cables associated with the 400 kV subsea link, ensuring the integrity and condition of the installed assets. Over this period, Finnish Sea Service also located subsea cable damages on four occasions and undertook repair works by diving, indicating a combination of routine inspection and targeted follow-up interventions along the interconnector route.