Negative
Setback or risk materialised
Medium Impact
Significant progress or notable issue
From 2013, the transmission power of the Fenno‑Skan 1 direct current cable was permanently limited to 400 MW due to its maximum voltage and submarine cable condition, leading Fingrid to reduce the available cross‑border capacity between Finland and Sweden and operate the link at only 80% of its 500 MW installed DC rating.