Positive
Project advancing - milestone achieved
Low Impact
Minor progress or informational
In April 2016, FAB Link Limited completed marine surveys along the proposed subsea cable route for the FAB Link HVDC interconnector between Britain and France. These geophysical and related surveys were carried out to characterise the seabed and inform detailed route selection and design for the offshore cables crossing the English Channel/La Manche.