RTE, as the French transmission system operator, was responsible for connecting the Eolmed pilot wind farm to the electricity grid via a 33 kV submarine and underground link of approximately 27 km, including the offshore cable route to the landfall at Port-La-Nouvelle and the onshore underground route to the Port-La-Nouvelle electrical substation.