Neutral
Informational - no clear directional impact
Low Impact
Minor progress or informational
In October 2023, the Floating Electrical Hub (FEH) for the EolMed project—manufactured in Limassol by Bourbon and Pine—was towed across the Mediterranean and installed off Port-La Nouvelle and Gruissan. The FEH was moored in position as the floating electrical substation that links the three floating turbines on one side to the shore connection cable on the other, enabling future export of electricity to the grid.