JDR to provide pre-commissioning, test and termination services for Baltic 2 inter-array cables (as subcontractor to SOC).
JDR was engaged as a subcontractor within the Baltic 2 inter-array cable package to provide pre-commissioning, testing and cable termination services associated with the wind farm’s inner array grid cable installation.