Ecosse performed boulder clearing and trenching works for Baltic 2 inter-array cable installation (as subcontractor to SOC).
Ecosse was subcontracted under the Baltic 2 inter-array cable installation scope to carry out boulder clearing and trenching works to support installation and protection of the inner array subsea cables.