Next Geosolutions was awarded contracts by Prysmian to execute detailed survey services supporting the design and engineering of the Eastern Green Links 1 and 2 submarine power cable systems. The scope included land topographical survey and marine geophysical and geotechnical survey activities along nearshore and offshore sections of the cable route corridors; EGL2 survey activities were stated to take place between Q2 and Q4 2026. The combined contract value for the two projects was reported as approximately €41 million (excluding options).