OCU Group was responsible for civil engineering works along the overland cable corridor for East Anglia TWO, including works associated with connecting the subsea and onshore cable sections. The scope described included horizontal directional drilling to install cable ducts deep within the sea cliffs to enable the subsea-to-onshore connection with minimal visual impact.