Negative
Setback or risk materialised
Medium Impact
Significant progress or notable issue
On 4 January 2011 a fault occurred on the 110 kV Dugi Rat–Postira submarine cable, after which operators determined that the failure could not be repaired, leaving the cable out of service and prompting the need for full replacement with a new XLPE‑insulated link. The outage removed the original 1968 oil‑filled three‑core cable from operation on the mainland–Brač I (Dugi Rat–Postira) route.