EPCI contract covering inter-array cables (67 cables, ~100 km total) and installation of two 42 km export cables.
Visser & Smit Marine Contracting B.V. (VSMC) was awarded the Export Cable Installation (EPCI) contract covering engineering, procurement, construction and installation of the inter-array cable system and installation of the submarine export cables for the Dudgeon Offshore Wind Farm. The scope included horizontal directional drilling at the landfall, installation and burial of two 42 km export cables, and the design, supply, installation, termination and testing of 67 inter-array cables with a total length of approximately 100 km.