Over 95 km of copper core inter-array cables for Dudgeon Offshore Wind Farm (inter-array, Hartlepool manufacture).
JDR was awarded a contract for the Statoil/Statkraft Dudgeon Offshore Wind Farm to design and supply copper-core inter-array cables. The project used over 95 km of inter-array cables (including 185 mm² and 500 mm² copper conductors) manufactured at JDR’s Hartlepool facility, along with associated cable accessories for installation.