Atkins Ltd was awarded the Wind Turbine Generator (WTG) monopile foundations engineering and management assistance contract for the Dudgeon Offshore Wind Farm. The scope covered engineering activities for each monopile foundation for the 6.0 MW turbines, including structural design, structural analysis, and drawing production, as well as geotechnical engineering input and follow-up of fabrication activities starting in 2015.