Ocean Infinity was contracted by RWE and Masdar to deliver 3D Ultra High Resolution seismic geophysical surveys for the Dogger Bank South (DBS) West offshore wind farm. Using the vessel Deep Helder from early June 2024 for around 30 days (weather dependent), Ocean Infinity surveyed subsea terrain at proposed wind turbine foundation sites to generate high-resolution 3D geological data beneath each turbine location, supporting early-stage identification of seabed and sub-seabed conditions and potential development constraints.