TGS was contracted by Dogger Bank South East developers RWE and Masdar to conduct detailed geophysical survey work at the DBS East array site. TGS began the campaign in April 2025, acquiring ultra-high-resolution seismic data and delivering geophysical acquisition, imaging and interpretation to assess subsea terrain and minimise geohazards at offshore wind turbine locations.