66 kV inter-array cable termination and testing for Dogger Bank C
SPIE Wind Connect, a subsidiary of SPIE, won a contract from DEME for the full scope of 66 kV inter-array cable termination and testing works on Dogger Bank C. The scope covered termination and testing on the remaining 87 Haliade-X 14 MW turbines as the final phase of the Dogger Bank Wind Farm inter-array cable programme.