Heerema Marine Contractors installed the Dogger Bank C HVDC offshore substation platform using the SSCV Sleipnir, including installation of the platform jacket followed by the offshore substation topside lift and set-down onto the jacket. The installation marked completion of the offshore substation platform installation for the Dogger Bank C phase.