Dogger Bank C inter-array cable network: ~250 km of 66 kV inter-array cables (known database route length 240 km)
DEME Offshore signed an EPCI contract with Dogger Bank Wind Farm for the inter-array cable package for the 1.2 GW Dogger Bank C phase. DEME’s scope included engineering and the installation works and it was to supply, install and protect approximately 250 km of 66 kV inter-array cables and related accessories for the offshore wind farm phase.