Heerema Marine Contractors installed the Dogger Bank C offshore HVDC platform using its heavy-lift vessel Sleipnir. Heerema completed offshore installation of the four-legged steel jacket foundation and subsequently installed the topside onto the jacket at the Dogger Bank C location, enabling handover for further commissioning ahead of future power transmission to shore.