Ryder Architecture provided design consultancy for the Dogger Bank wind farm Operations & Maintenance (O&M) Base at the Port of Tyne, working with operations lead Equinor on the facility design intended to support long-term operations of the Dogger Bank project (including Dogger Bank B).