ABB was appointed to supply the electrical infrastructure for the Dogger Bank project phases, including systems such as auxiliary control systems, operational technology (OT) security, information technology (IT) infrastructure, condition monitoring, telecommunications, low-voltage power distribution and bus ducts. The scope was described in relation to delivery of the offshore substation electrical system and was stated to cover all three phases (A, B and C), which includes the Dogger Bank B offshore transmission assets.