Smulders was awarded a contract to manufacture transition pieces for the first two phases of Dogger Bank Wind Farm (Dogger Bank A and Dogger Bank B) as part of the Sif–Smulders consortium arrangement referenced by the developer. Smulders’ scope included manufacturing secondary steel and assembling, coating and testing fully equipped transition pieces.