Offshore Heavy Transport (OHT) signed a contract with Dogger Bank Wind Farm to transport and install the foundations for Dogger Bank A, the 1.2 GW first phase of the Dogger Bank offshore wind farm in the UK North Sea. The monopile foundations were planned to be installed in the 2022–2023 timeframe using OHT’s new-build heavy installation crane vessel Alfa Lift.