Fugro was scheduled to commence a geophysical survey campaign in the Dogger Bank area using the survey vessel Fugro Frontier, with operations planned to run continuously through approximately 30 August. The scope also included a single-line multibeam echosounder (MBES) survey using the vessel Celtic Mara along each of the Dogger Bank A and Dogger Bank B route sections of the seabed (weather dependent, one-day scope).