Positive
Project advancing - milestone achieved
Medium Impact
Significant progress or notable issue
During the same installation campaign, Nexans carried out and completed the landfall operations for the Dieppe–Le Tréport Export connection by floating the export cable into position, pulling it ashore through a pre-installed duct to the transition joint bay, and aligning it with the pre-dug subsea trench.