Akti Engineering performed reconnaissance marine geophysical and geotechnical survey work (including a desktop study) to support cable route design and engineering for Cyclades Interconnection Phase D, covering the Lavrio–Serifos and Serifos–Milos 150 kV AC submarine cable system for IPTO.