Reconnaissance marine geophysical / geotechnical survey, including DTS, for cable route design and engineering ... Phase D). Lavrio – Serifos Isl. and Serifos Isl. - Milos Isl.
AKTI Engineering performed a reconnaissance marine survey campaign for Cyclades Interconnection Phase D covering the Lavrio–Serifos and Serifos–Milos 150 kV AC submarine cable links. The scope included a desktop study and reconnaissance marine survey, with marine geophysical and geotechnical survey inputs, to support cable route design and engineering for IPTO.