By May 2018, IPTO had completed Phase A of the Cyclades interconnection—a 150 kV radial link from Lavrio to Syros with onward connections to Paros, Mykonos and Tinos—so that the island loads were supplied by the Hellenic Electricity Transmission System, bringing the Syros–Tinos cable into full commercial operation as part of the overall system.
| Cyclades | Cyclades | |
|---|---|---|
| Landfall | Syros (Syros island) | Tinos (island of Tinos) |
| Grid Connection | Syros 150 kV/MV GIS Substation | Tinos 150 kV terminal site |
Cyclades
Cyclades
1 Cost inflated in local currency then converted to euros (where applicable).