Wergeland Group, operating its Sløvåg base in Vestland, Norway, was subcontracted by Archer Wind for final yard assembly and outfitting of the Ocergy-designed bolted floater hull (steel fabricated by Lykomitros Steel S.A. in Greece). As of late December 2025, hull assembly was complete with boat landings and walkways fitted; offshore installation had not yet commenced. Sløvåg has previously hosted assembly for Hywind Tampen and Hywind Scotland.