Continental Link Multi-Purpose Interconnector
18 September 2023
Neutral
Informational - no clear directional impact
Low Impact
Minor progress or informational
On 18 September 2023, National Grid presented the Continental Link Multi-Purpose Interconnector (“Continental”) as one of its three Offshore Hybrid Asset projects in development, alongside LionLink and Nautilus. The presentation described Continental as being at an early development stage with various design options under consideration, including a connection to Norway via a UK offshore wind farm and a parallel connection to Denmark, with indicative commercial operation timings of 2035 for the Norway link and 2033 for the Denmark link.