As part of the Codling Wind Park planning application, detailed offshore export cable route engineering was completed, including burial and protection design for the three 220 kV offshore export cables between the Codling Bank offshore substations and Poolbeg. Planning drawings dated 15 August 2024 define preferred offshore export cable alignments with associated limits of deviation, minimum burial depths of 1.4 m below seabed, and the use of rock or concrete mattress secondary protection where target burial cannot be achieved.