Framework agreement for emergency and planned repairs, jointing and spare parts for the COBRAcable land and submarine HVDC XLPE cables.
Prysmian Powerlink S.r.l. was selected by Energinet under a framework agreement for repair and maintenance services on the COBRAcable interconnector. The framework covers both the land and submarine DC XLPE cable system and includes emergency and planned repair campaigns, jointing works, and the delivery of spare parts such as land and submarine cable joints and transition joints between land and submarine sections. The agreement provides Energinet with a dedicated cable manufacturer to carry out fault repairs and planned interventions on COBRAcable during its operational life, supporting long‑term availability of the 700 MW link between Denmark and the Netherlands.