NOV supported Cerulean Winds under a whole-system design approach for its INTOG floating offshore wind developments (including Cedar). Work delivered covered the floating substructure (including model wave tank testing of NOV’s 15 MW scalable tri-floater design and associated certification), plus integrated interface work across moorings and dynamic cables, supporting preparation of front-end design outputs and installation plans for gigawatt-scale floating wind farm delivery.