inter-array cables system
Ocean Installer was appointed by Cerulean Winds to join the alliance developing the 1 GW Aspen floating offshore wind project in the UK Central North Sea. Post-FID, Ocean Installer was expected to provide engineering expertise and offshore installation services using its vessel fleet and subsea construction capability, including installation of the mooring system, installation of the inter-array cable system, and marshalling of floating units during fabrication, tow-out and hook-up.