Positive
Project advancing - milestone achieved
Low Impact
Minor progress or informational
In December 2023, The Crown Estate’s PDA 3 Characterisation Report documented a spatial analysis of Levelised Cost of Energy and engineering risk, concluding that PDAs 1–3, including PDA 3, lie in a relatively low LCOE area near shore suitable for HVAC export and that multiple floating technology types are feasible despite some significant but manageable metocean and geotechnical risks.