Asso.subsea carried out boulder clearance and pre-trenching works along the planned Celtic Interconnector cable route between the south-east coast of Ireland and the northern coast of France on behalf of Nexans. The seabed preparation activities were performed within the cable corridor (approximately +/-500 m either side of the planned cable centreline) using the trenching support vessel Aethra.