LR Senergy prepared the Cable Burial Risk Assessment (CBRA) and related geotechnical analyses for the Caithness–Moray (LT21) circuit in 2015. The work assessed sediment mobility and burial feasibility along the route, informed burial depth specifications and identified locations where protection measures (e.g., rock placement) would be required.