iSurvey was commissioned to perform post-construction inspection surveys in 2018 to assess the as-laid Caithness–Moray cable. The survey used ROV-mounted MBES and the Pangeo sub-bottom imager to inspect multiple route sections (including Portgordon Omega loops and multiple KP ranges) to confirm cable position, burial status and local seabed conditions following installation.