Jan De Nul Group carried out installation of scour protection for the 80 monopile foundations at the Butendiek offshore wind farm. The works included placement of filter rock (reported at ~71,000 tonnes) and armour rock (reported at ~123,000 tonnes), using fall-pipe/rock installation vessels including Simon Stevin and Tiger, with equipment modifications to handle large rock sizes.