Ballast Nedam was contracted to engineer, supply/manufacture and install the wind turbine generator foundations at the Butendiek offshore wind farm. The scope covered the design work (via Ballast Nedam Engineering), fabrication/supply of the monopiles and transition pieces, and offshore installation of the 80 monopiles (installed using HLV Svanen) with subsequent transition piece installation activities.