Van Oord was contracted by DONG Energy to install the 32 monopiles and transition piece foundations at the Burbo Bank Extension offshore wind farm. The scope also included supplying and installing scour protection and providing logistics between fabrication ports in Germany, Denmark and the UK and the offshore site. Van Oord planned to use its heavy lift vessel Svanen for the installation campaign, which was reported as completed in 2016.